San Antonio International Airport: Difference between revisions

No edit summary
Line 69: Line 69:
==Facilities and Transportation==
==Facilities and Transportation==


The airport facilities are currently undergoing a major, $340 million expansion project which will add new terminals and parking facilities. The ultimate master plan for the project will increase gate capacity to 34.
The airport facilities are currently undergoing a major, multi-million dollar expansion project which will add new terminals and parking facilities. The ultimate master plan for the project will increase gate capacity to 34.


San Antonio International Airport currently has two terminals with 24 jet-bridge gates (as well as 3 seldom-used ground-loading gates). The original one-level terminal (now Terminal 2) opened in 1953 with ground-loading holding areas and was expanded twice, once in 1959 with new east and west wings and again in 1968 with an 8-gate satellite concourse. A second terminal (now Terminal 1) opened in 1984 with a 16-gate concourse. The U.S. Customs Federal Inspection Station (FIS) is located in Terminal 1. Gates 1-2 and 10-11 have direct access to the FIS.
San Antonio International Airport currently has two terminals with 24 jet-bridge gates (as well as 3 seldom-used ground-loading gates). The original one-level terminal (now Terminal 2) opened in 1953 with ground-loading holding areas and was expanded twice, once in 1959 with new east and west wings and again in 1968 with an 8-gate satellite concourse. A second terminal (now Terminal 1) opened in 1984 with a 16-gate concourse. The U.S. Customs Federal Inspection Station (FIS) is located in Terminal 1. Gates 1-2 and 10-11 have direct access to the FIS.
95

edits