186
edits
Samrammstein (talk | contribs) |
Samrammstein (talk | contribs) |
||
Line 59: | Line 59: | ||
Please note that runway 2 is usually closed between 1200 and 1500 hours. Also check before making any journey which way the aircraft are flying!. For approx 20% of the year, the wind shifts and the flying changes direction. | Please note that runway 2 is usually closed between 1200 and 1500 hours. Also check before making any journey which way the aircraft are flying!. For approx 20% of the year, the wind shifts and the flying changes direction. | ||
===Runway 05L - Approach and Landing=== | ====Runway 05L - Approach and Landing==== | ||
From the Moat House hotel, cross the A538 and head back to the roundabout. On the other side of the road, there is a footpath with steep steps leading up a hill. Follow this path for roughly 15 minutes past the rear side of the new fire station and follow the path on the left side fence of the fire station. Follow this path (it goes a bit up and down) until you descend into a valley and the River Bollin tunnel. | From the Moat House hotel, cross the A538 and head back to the roundabout. On the other side of the road, there is a footpath with steep steps leading up a hill. Follow this path for roughly 15 minutes past the rear side of the new fire station and follow the path on the left side fence of the fire station. Follow this path (it goes a bit up and down) until you descend into a valley and the River Bollin tunnel. |
edits