Corfu Island International Airport: Difference between revisions

Jump to navigation Jump to search
no edit summary
No edit summary
Line 24: Line 24:
In April 1965 the airport became International and the first flight under Air Traffic Control was realized with jet type Comet of Olympic Airways.
In April 1965 the airport became International and the first flight under Air Traffic Control was realized with jet type Comet of Olympic Airways.
The construction of a new passenger station was finished in 1972. The runway today reaches 2.400 meters, width 45 meters.
The construction of a new passenger station was finished in 1972. The runway today reaches 2.400 meters, width 45 meters.
2014, the Airport of Corfu handles 2.3 mio. (+13.1%) passengers and 19.018 flights (+14.2%).
 
2015, the Airport of Corfu handles ca. 2.43 mio. passengers and more than 18.000 flights.
   
   


226

edits

Cookies help us deliver our services. By using our services, you agree to our use of cookies.

Navigation menu